Skip to main content
User Guides

Billing and cost rates

Every hour your team records has two rates. The billing rate is what the client pays for it. The cost rate is what the hour costs your firm. EVX Software finds both from two things the hour carries: its rate schedule and its labor category. Together they give the project's billed amounts, its costs, and its margin.

Jump to:

How an hour is priced​

ConceptWhat it isExample
Rate scheduleA group of prices. A project carries one, and its tasks and time take it.2026 - Standard rates
Labor categoryA kind of work or role. A task or time entry carries one.Project Manager
Billing categoryOne price: a labor category inside a rate schedule.Project Manager in 2026 - Standard rates
Billing rate and cost rateThe two amounts of a billing category, per hour.$185.00 billed

So the same labor category can have one price in your standard schedule and another in an agency's schedule. See Rate schedules.

Each row is one price: a labor category in a rate schedule.

A billing category can also name one person in its User field, for a rate agreed for that person. See Billing categories.

Where you see the rates​

  • Time shows each entry's billing rate.
  • Invoices list each hour with its rate. See Generating invoices.
  • The billing report shows the billing rate of each entry before you invoice. See Billing report.

If a rate changes after time was recorded, Recalculate billing in Time recalculates the billing of the entries.

Rates for things other than labor​

Products and services, such as a laboratory test or mileage, have their own cost and price in each rate schedule, set as product types. See Product types.

Who can change a rate​

Rates are set by administrators in Settings. Whether a user can change the rate on a task or a time entry depends on their permissions and on your firm's settings. See Setting up rate schedules.

Example: the same role at two prices​

A Project Manager bills $185.00 an hour in the firm's 2026 standard schedule. A state agency has agreed a lower rate in its own schedule. A project manager records four hours on each kind of project: the hours on the agency's project bill at the agency's rate, and the others at the standard rate. The cost rate is the same on both, so the agency project shows the smaller margin.

What you can do next​

  1. Billing categories for where rates are set.
  2. Contract types for how the rates fit each way of billing.
  3. Labor categories for choosing the right category on your time.
Previous: Financial management